3、 Carpentry 53. It is best to use dried Larch for the keel of the ground. 54. After buying large wood boards, it is necessary to saw and air dry them. 55. Carpentry should first snap the horizontal line of the house when entering the site. 56. Once the colored panel comes in, it is necessary to buy a paint brush to prevent it from getting dirty. 57. The ceiling fan cannot be installed on the ceiling keel. 58. During the construction of the colored panel, it is necessary to select the color in advance. 59. The hanging bar of the ceiling should not be more than 30 away from the wall

III. carpentry

53. It is best to use dried Larch for the keel of the ground. 54. After buying large wood boards, you should cut them to dry them. 55. Carpentry should snap the horizontal line of the house first when entering the site. 56. Once the colored panel comes in, you should buy a paint brush to prevent it from getting dirty. 57. The ceiling fan cannot be installed on the ceiling keel. 58. During the construction of the colored panel, you should select the color in advance. 59. The distance between the hanging bar of the ceiling and the wall should not be greater than 300 60 The gypsum board should be fixed with countersunk self tapping screws, enter the board surface by 1~2mm, and undergo rust prevention treatment. Gun nails are not allowed. 61. The distance between the nails of the gypsum board should not be greater than 200. 62. The gypsum board should have a 3mm joint with the wall for crack prevention treatment. 63. The external corner of the gypsum board should be protected by external corner strips. 64. The upper and lower risers of the wooden door should be painted. 65. The bottom of the toilet door cover should be painted with waterproof paint. 66. The size of the door should be consistent. 67 Try not to let the carpenter do the furniture. If you can't do it well, 68. Try to buy the whole cabinet. If the carpenter can't do it well, the design can't be good. 69. The size of each medium must be considered well, and it's more troublesome to change it. 70. Don't make a dark track for the sliding door you make, which can't be repaired in the future. 71. If the bathroom is small, try to do a sliding door, don't open the door, occupy a place. 72. If you can't eat the woodworking work, you must communicate more with the foreman, Don't let them make their own decisions. 73. Money is the last word. 74. There are children at home, and the glass should be used less. 75. Be sure to let the workers have a good look at the drawings. 76. The kitchen drawers are very useful. 77. The flatness of the wooden dragon bone on the floor is 5mm. 78. The rough floor should be paved at 30 degrees or 45 degrees. 2~3mm should be left between the plates, and the seams should be staggered. 79. 8~10mm should be left between the floor and the wall. 80. When the length of the composite floor exceeds 8m, expansion joints should be considered. 81 Try not to use MDF as door jambs. 82. Hinges and hardware must be used well. 83. Yuba should be installed on the wooden keel, not directly on the ceiling. Key words: home decoration construction supervision

南昌眼科医院

温州皮肤病医院

上海精神医院

南宁男科医院

Copyright © 2011 JIN SHI